A Letter of Map Amendment is FEMA's official correction for a building mapped into a flood zone it sits above. It's the mechanism behind every legitimate "get out of flood insurance" story.
| What it does | Officially removes your structure from the Special Flood Hazard Area — the mandatory insurance requirement goes with it |
| FEMA fee | $0 for a standard single-structure LOMA |
| What it requires | Field-surveyed elevations certified by a licensed land surveyor or engineer (typically $800–$2,000) |
| Timeline | Days to weeks via eLOMA (licensed professionals filing electronically); up to 60 days by mail |
| The test | Lowest adjacent grade of the structure at or above the Base Flood Elevation |
The expensive mistake is hiring the surveyor first. If your ground turns out to be below the BFE, the survey money is gone and the LOMA is dead. The right order:
LOMA: your structure sits on natural high ground (no FEMA fee). LOMR-F: your pad was raised with engineered fill (FEMA review fee applies). LOMR: FEMA revises the map for a whole area — this is how entire neighborhoods get removed at once, and why it's worth checking whether you're already out.